the use of “Clean & Cheap” Energy.
know how much you can save!
Who Are We !
CERTIFICATION
COMPANY PROFILE
VISION AND MISSION
Tracking Numbers!
Why Mangalam Biomass Gasifiers?
- Save Fuel Cost Up To 69%
- Easy to install without any alterations to the ongoing operations
- Clean combustion, high thermal efficiency, and compact system
- 6-8 months of payback period
- Worldwide accepted technology for eco-friendly and renewable energy source
Why Choose Us
Huge Savings
We quantify the success of the plant in terms of huge savings for our clients.
Production Capacity
We ensure that the installed gasifier system is sufficient to deliver desired production capacity.
Money Back Guarantee
In case of dissatisfaction, we will take the machine back with 100% money back guarantee.
Periodic Services
Any machine needs periodic servicing to function efficiently, therefore we provide onsite services for our Biomass Gasifier Systems.
Experienced Operators
For hassle-free operation of gasifiers, we can also provide you with experienced technicians to oversee machine operations.
Technology Upgradation
With consistent R&D, our engineers aim towards improvising the gasification technology and can do necessary upgrades for our existing clients as well.
One Step Towards Nature
- Reduced usage of scarce fossil fuels
- Clean & renewable source of energy
- Pollution free burning of biomass
Our Products
Prestigious Installation
Industries We Cater
Biscuit & Bakery (Swing Oven, Rotary Oven & Tunnel Oven)
Sweets & Namkeen
Confectionery
Pharmaceutical
Roasting ( Peanuts, Rice Flakes, etc.)
Wafer Biscuit
POP
Confectionery items (candy etc.)
BOPP Tape
Textile
Paper Drying
Batch Annealing of Steel and Aluminium
Case Study
of the MGC – 100 to bring down their overall expenditure on fuel.
Installation of MGC – 100 with a thermal output of 10,00,000 Kcal/hr at a Bakery based in Kolkata.
We successfully fulfilled delivery of the gasifier within 90 days from the date we received the advance payment. Additionally, we provided the supervising engineers/operators to oversee the Gasifier System Erection and Installation at the site. We were able to complete the installation within 15 days with minimum disruption in the plant operations.
After having it monitored with our supervisors, we were able to calculate the monthly savings on fuel expenditure of the plant. The final savings of that particular plant came out to be 10,24,352 INR/Month.